Case Studies / Mini Crawler Cranes
Steel Column Installation in a Narrow Gap
Installing steel columns in the narrow gap between a building and its scaffolding.

About this case
Installing steel columns in the narrow gap between a building and its scaffolding.
This is a jobsite photo of the GSC80D in construction & steel work. The full specifications are on the model page. Send your load, working height and access details to ask about a similar job.
More GSC80D case studies
All case studies
Mini Crawler CranesPower & Utilities
Lifting at a 220 kV Substation
The GSC80D lifting equipment among substation structures.

Mini Crawler CranesPower & Utilities
Substation Equipment Lifting
The GSC80D set up on outriggers for lifting at a substation.

Mini Crawler CranesConstruction & Steel
Rooftop Steel Structure Lifting
The GSC80D lifting steel structure members on a roof.
Planning similar work?
Send the load or working height, the access route and your ZIP code. GLT will reply with model options and a written quote.
Request a QuoteContact GLT