Case Studies / Mini Crawler Cranes

Steel Column Installation in a Narrow Gap

Installing steel columns in the narrow gap between a building and its scaffolding.

Steel Column Installation in a Narrow Gap

About this case

Installing steel columns in the narrow gap between a building and its scaffolding.

This is a jobsite photo of the GSC80D in construction & steel work. The full specifications are on the model page. Send your load, working height and access details to ask about a similar job.

More GSC80D case studies

All case studies
Lifting at a 220 kV Substation

Mini Crawler CranesPower & Utilities

Lifting at a 220 kV Substation

The GSC80D lifting equipment among substation structures.

Model used: GSC80D

Substation Equipment Lifting

Mini Crawler CranesPower & Utilities

Substation Equipment Lifting

The GSC80D set up on outriggers for lifting at a substation.

Model used: GSC80D

Rooftop Steel Structure Lifting

Mini Crawler CranesConstruction & Steel

Rooftop Steel Structure Lifting

The GSC80D lifting steel structure members on a roof.

Model used: GSC80D

Planning similar work?

Send the load or working height, the access route and your ZIP code. GLT will reply with model options and a written quote.

Request a QuoteContact GLT