Case Studies / Mini Crawler Cranes
Equipment Lifting Between Substation Frameworks
Lifting power equipment in the tight space between substation structures.

About this case
Lifting power equipment in the tight space between substation structures.
This is a jobsite photo of the GSC80D in power & utilities work. The full specifications are on the model page. Send your load, working height and access details to ask about a similar job.
More GSC80D case studies
All case studies
Mini Crawler CranesPower & Utilities
Lifting at a 220 kV Substation
The GSC80D lifting equipment among substation structures.

Mini Crawler CranesPower & Utilities
Substation Equipment Lifting
The GSC80D set up on outriggers for lifting at a substation.

Mini Crawler CranesConstruction & Steel
Rooftop Steel Structure Lifting
The GSC80D lifting steel structure members on a roof.
Planning similar work?
Send the load or working height, the access route and your ZIP code. GLT will reply with model options and a written quote.
Request a QuoteContact GLT