Case Studies / Tracked Spider Lifts

Substation Maintenance at Height

The boom positions the basket beside insulators at an outdoor substation.

Substation Maintenance at Height

About this case

The boom positions the basket beside insulators at an outdoor substation.

This is a jobsite photo of the GCT43 in power & utilities work. The full specifications are on the model page. Send your load, working height and access details to ask about a similar job.

More tracked spider lift case studies

All case studies
Overhead Plant Maintenance

Tracked Spider LiftsIndustrial & Plant

Overhead Plant Maintenance

A red tracked lift raises a worker among pipes and tanks inside an industrial building.

Model used: GCT43

Tracked Spider Lift Working Beside a Transformer

Tracked Spider LiftsPower & Utilities

Tracked Spider Lift Working Beside a Transformer

The basket is raised along the wall beside a transformer at a power facility.

Substation Work from the Basket

Tracked Spider LiftsPower & Utilities

Substation Work from the Basket

Two technicians work on outdoor electrical equipment from the raised basket.

Model used: GCA66

Planning similar work?

Send the load or working height, the access route and your ZIP code. GLT will reply with model options and a written quote.

Request a QuoteContact GLT